YSSE FABRICATOR SDN BHD
Fabrication and Engineering Services
Gumusut Kakap,
Shell Malaysia
Development drilling began in January 2008. Early production started at the field in November 2012. This was ahead of engineers completing the floating production system (FPS) by linking Gumusut-Kakap’s production wells to the KiKeh production facility, the country’s first deep-water development,operated by Murphy Sabah Oil. This early production is an interim measure to bring 25,000 barrels a day on stream ahead of completing the FPS. The semi-submersible production facility was secured to the seabed at the Gumusut-Kakap field in June 2013.
Technology - The Gumusut-Kakap field is the first deep-water opportunity for Shell in Malaysia.
YSSE was responsible fabrication and installation piping and installation fibre glass grating in the project. The project had been done in-time and with zero injury. The work has become easier for us as we have gained enough experiences over the years.